SEATTLE STREETCAR
To Single Track

A block or two before the downtown terminal the two tracks merge to one.  The signal for other road traffic is green, but the Streetcar must wait for its own cycle.  Its own signal is visible above the "One Way" sign to the right.  Once cleared it will proceed to the lane on the other side of Westlake Ave., which for these two blocks is reserved for rail transit.

Previous in Series

Next in Series: Downtown End