PORTLAND MAX LIGHT RAIL
Slower Going Ahead

After inbound trains leave the right of way paralleling the Banfield Freeway there is an overpass across the Union Pacific, and then, as pictured here, comes a short transitional stretch to reach running along NE Holladay St. at the eastward beginning of the Free Rail Zone.  Train speeds slow down considerably at this point, and will stay slow through the Lloyd District, over Steel Bridge, and all through downtown. 

Previous in Series

Next in Series: Tight Loop