This view from 2004 shows a much more confined end to the
right of way at Gresham. Although it looks as if the line was built with
further expansion in mind, the tracks extend beyond the station for storage
purposes only, and no extension is contemplated. The speed limit sign, visible on the previous page in this
series, is gone. |