This view from springtime of 2008 shows roadbed
preparation still very much in progress for the Green Line to be. The
camera is pointed generally south from the overpass along E Burnside Ave.
Power poles and overhead lines were still something for future
construction.
In the distance the roadbed descends to pass under Interstate 205. The
rest of its run will be along or near the west side of the freeway. |