The two tracks of the future Green Line were in
different stages of preparation at the time of this photo from May, 2008.
No work had been done yet on the power distribution system.
To the left, an off-ramp takes traffic from Interstate 205. To the
right, the original MAX route to and from Gresham shows reaching to or descending
from a higher grade. |