When it was constructed in the 1990s
significant portions of the light rail system were limited to a single track, with provision made for
expansion as funding would permit. A major project during the
next decade accomplished double-tracking over most of the territory. Only about 2.6
miles of the thirty or so route miles remain
single-track.
This scene shows the set of rails
at Linthicum which originally carried trains heading both inbound and outbound.
|